Bucket Chain Gold Mining Dredger

CZPTdredging Bucket Chain dredger

one.Firm Profile

HangCZPT CZPT Dredging Weighty Industry Co., Ltd. is specialized in exploring, production and selling cutter suction dredger, wheel bucket dredger, jet suction dredger, bucket chain dredger,  multi-purpose provider work boat ,sand transportation ship and so on, which are widely employed in sand mining, river dredging, desilting, gold/diamond mining , port construction etc. All the merchandise can be CZPT according to client’s necessity.

We have skilled R&D division, CAD drawing layout heart, top quality management office, following-sales service division, operating and purchasing department and product tests center. Our company has much more than 200 personnel, which includes five professional senior engineers on dredger constructing and studying, and far more than twenty five intermediate quality specialized personnel. They focus in designing and developing dredgers and sand mining machinery.

In latest years, our dredgers and gold mining equipment have been successfully exported to Malaysia, Pillippines, Indonesia, Bangladesh, India, Brazil, Xihu (West Lake) Dis.via, Benin, Egypt, Nigeria, Cango, Liberia, Tanzania, Sultan , Russia ,Ukraine, Iran, Saudi Arabia, Pakistan, and North Korea, and many others.. 

two.Product Description

Bucket chain dredgers have good capacity to suit distinct types of  geologic composition. With the advantages of steady performance, lengthy doing work existence,lower cost, higher effectiveness and tiny upkeep, its pontoon adopts the assembled box composition, which is equipped with excavation system, lifting unit, big particle filter unit, transmission unit, transfer unit, excavated sediment shipping to the sand transportation ship by the conveyor belt. The method including mining sand separation, stone broken, stone grading, sediment washing separation, hefty metallic extraction, dehydration, transportation and so on. bucket chain dredger is ideal for salt mining, gold/diamond mining, difficult riverbed exploiting and channel cleHangCZPT.

three.Merchandise Application

    1.Sand mining,
   2. Gold/diamond mining

   3.Salt mining

   4.Hard riverbed exploiting

   5.River/lake desilting

 

4.High definition-BCD100 Bucket Chain Dredger 100m3/h

 Bucket chain dredger can be CZPT according to the need of the consumers.
 

Design Hd-BCD100
LOA 29m
Hull size(LxWxH) 25.0×6.0x1.0m
Primary motor brand CZPT
Principal motor electrical power 105kw
Max. dredging depth 20m
Draught .7m
Max. capacity 100m3/h
Chain bucket qty. 100pcs
Chain bucket speed 15.2m/min
Chain size 700x100x30mm

five.Upkeep and Help

  1. Following shipping and delivery we send two skilled engineers who will be to manual setting up and prepare regional workers.
  2. Support spare areas are in stock.
  3. We gives a convenient way for you to purchase areas. You can simply decide on the parts you require in accordance to your specs and have them shipped immediately to your internet site.
  4. twelve months producing guarantee on all new mounted part components.
  5. 12 months guarantee on engine.
  6. twelve months guarantee on hull and all fabricated elements.
  7. In the function that our clients dredging knowledge unskilled or mechanical failure or they just need to have to shoot a small difficulty, our engineers are CZPT at customer’s services, there are always engineers for installation and training if clients requirements.

 

6.Our Workshop

7.Manufacturing facility Manufacturing Line

eight.Our Scenario

   
9.Patent Certification

ten.Other Products

eleven.FAQ

1. Planning work before Dredger Testing
   1) CZPTers will be invited to look at dredger examination , radio and pictures will e mail to          buyers.
   2) CZPTy components and connections of dredger must be checked strictly before take a look at.
   3) Oil and cooling water need to be completely ready for dredger test.
two. Pontoons Welding
    Using welding failure detector to examine the welding quality.
3. Dredger Painting
    Our dredger development components are of shot blasted plate with store primer. Dredger right after design and assembly all rusty surfaces, welding spots and damaged shop primer will be cleaned and coated with primer.
four. No-load Check
   1) All the main tools, like Motor, Gearbox, Pump, CZPT method.
   2) CZPT technique, are analyzed for at minimum two several hours in manufacturing facility.
   3)All the suppliers of the primary parts need to be on the location to fix any problem.
5. Dismounting and Packing
   1)All the parts are marked before dismounting.
   2)All the little components are put into packaging box with a packing record.
   3)All the hydraulic pumps and pipes joints are packed by plastic wrap.
   4)CZPTy element ( no matter how tiny ) is registered on the packing listing.

twelve.Get in touch with Way:

 

Bucket Chain Gold Mining Dredger