C Channel Roll Forming Machine C Shaped Profile Roll Forming Machine C Stud and Truss Aluminum Strip Ceiling Board Roll Forming Machine Suspended Grid

Item description of  C Channel Roll Forming Equipment C Shaped Profile Roll Forming Device C Stud and Truss Aluminum Strip Ceiling Board Roll Forming Machine Suspended Grid 

     This Cold metal roofing panel roll forming device is designed by our specialists using substantial quality element. Steel sort Roofing Panel has a lovely physical appearance and vibrant colour. It is extensively employed in backyard, factory, resort, resort, exhibition corridor, vacationland,historical architectures and present day villa.
    Device are CZPT as for every your request

Comparable equipment maybe u like:

Functioning method

     The complete line involves decoiler, forming device, personal computer controlling method and run out tables. Our devices are outfitted with a computer managing system to hold goods accurate.

Principal parameter 

 

NO

Sort

Specification

1

Raw materials Sort GI
Feeding width Depend on customer’ drawing
Thickness .three-.6 mm

two

Decoiler Operation Manual
Weight apacity three Tons

3

Principal entire body Roller station ten row
Diameter of shaft 55 mm
Shaft material forty five# with .05mm chrome
Roller substance 45# with .05mm chrome
Kind Chinese type
Frame 300mm C-beam
Frame thickness 16 mm
Substance Cr 12
Operation CZPT automatic
Operating pace 8-12 m/min

four

Electricity Driving way Chain 1 inch
Major motor four KW
Voltage 380V/50HZ, 3 stage

5

Management box CZPT box PLC management system, inventer
PLC brand name Delta created in ZheJiang
Inverter model Delta manufactured in ZheJiang
Language Chinese and English

Guide decoiler
It is passive variety could load coil by expend the blots fix at coil internal diameter. It truly is simple to run and affordable solution. 
Xihu (West Lake) Dis. unit
Undertake guiding bar and sliding block to control the width and situation of the steel sheet. The coil is guided in the correct position and passed to the roll forming program. Can change the guiding bar with loosing the correcting bolts to feed sheet in correct place. It is fixed composition to make positive can not move effortlessly. 
Roll Forming System: 
Roll forming technique consist of machine frame, transmission technique, electrical motor and roll forming technique. 
A. Machine frame adopts welding construction with shot blasting and portray treatment method
B. All rollers content adopt higher quality No. 45 metal, with hard chrome coated on surface area, all treatment by complete CNC machines, to make confident the rollers with excellent rigidity and precision, and type best roofing sheet as for every layout. 
C. All rolling shafts are produced by substantial high quality No. 45 metal with quench and mood remedy, so the shafts with good rigidity which could use for prolonged tern CZPT deformation. 
D. Rolling shafting supporting composition sort is steel wall and welded with the basement collectively to have rigidity. 
E. Cycloidal pin equipment pace reducer motor driven, the again/CZPT roller pushed by chain, portion of higher/lower rollers pushed by equipment
F. Modify the screw bar manually to modify the distance between higher/reduced rollers for difference thickness of sheet. 
(Attention: all rolling technique has modified in our firm as a perfect predicament, we will not recommend to change the rollers at random, if needed, ought to change by a experienced technician or right after practice by our engineer. In any other case will lead to the equipment can not form a good profile
Slicing unit
A. Adopts submit chopping, the chopping blade material is Cr12 with quenched remedy, following slicing, there is no materials squandered. 
B. Adopts welded body for great rigidity. 
C. The cutting action is droved by the electricity from hydraulic station which guarantees the procession of the cutting and minimal noisy, long life. 
CZPT Program
It is controlled by equipment wheel oil pump. Soon after filling the hydraulic oil into the hydraulic oil tank, the pumps drive the cutter equipment to begin the cutting job. 
The method involves a set of hydraulic tank, a set of hydraulic oil pump, two hydraulic pipes. And two sets of electromagnetism valves. 
Electrical power of the oil pump: 3kw
CZPT oil: 40#
PLC handle method 
It adopts industrial computer to control. The target piece’s size is adjustable and digit of it can be altered. Computed manner has two modes: automatic and handbook one. The method is easy to operate and use. 
Processing precision: within one.00mm
It is made up of liquid crystal monitor, programmer, transformer for the digital machines and kits of each and every element. Contact display
PLC is ZheJiang Panasonic
Transducer model is ZheJiang  Delta
The seller need to give Chinese and English language monitor
Counter
One counter gauges length, pulses, and decides duration. 
 

To verify device online video or a lot more confuse, contact with me

We machine market to plenty of countries

Our certificate

Business information

   CZPT group is a skilled manufacturer planning and generating roll forming devices recognized in June 1996. We have four factories functioning in ZheJiang , ZheJiang and ZheJiang province. Far more than four hundred personnel supply services for u.
     Products largely incorporate trapezoidal steel roof/wall panel equipment, C&Z form purline machine, highway guardrail equipment, sandwich panel manufacturing line, deck forming machine, C U L light-weight keel equipment, shutter slat door forming machine, slicing device, downpipe device, gutter device, and so on.

Our provider

1. Free technological assistance and free components source.

2. Engineer CZPT to services equipment abroad.

three. One calendar year warranty is provided.

four. Long life technical advice for free of charge.

5. We often provide complex help, swift response, all your inquire will be replied in 24 several hours.
 

Concern & Response

1. Q: How to visit our company:

     A: Fly to ZheJiang  Airport: By fast train From ZheJiang South station to HangCZPT west station

(1hour), then we can pick up you to factory(40min).

     B: Fly to ZheJiang  Airport: By fast train From ZheJiang  Xihu (West Lake) Dis.ao station  to HangCZPT west    

station(4.5 hours), then we can pick up you to manufacturing unit(40min).

two.  Q: What need to I supply if I want to CZPT device?

     A: U need supply profile drawing, content, thickness, voltage and your special requirements.

three.  Q: What is the Guarantee?

     A: Within 12 mounts, all technicals are prepared to provide you at any time.

four.  Q: What can you do if the equipment damaged?

     A: Our machine’s warranty period is 12 months, if the damaged elements are unable to fix, we will send

new elements exchange the damaged parts cost-free, but you require spend the categorical price if right after guarantee period of time. we can negotiate to fix the issue, and we provide the technical assist for total lifestyle of equipment.

5.  Q: If need technician to workshop to debug and train, how to do?

     A: We despatched technician to your nation to repair the device. Buyer should bear value which includes: visa, spherical vacation ticket and ideal lodging, also buyer ought to shell out the salary 100 USD/working day.

 