Steel Coil Aluzinc Galvanized Automatic Slitting Building Construction Making Machine

Steel Coil Aluzinc Galvanized Automatic Slitting Developing CZPT Producing Equipment

one. Standard info

(1) Content of frame: (high grade) 80mm H shape metal welding
(2) Thickness of center plate: 12mm
(three) Phase of forming roller: 2steps
(4) Diameter of shaft (solid shaft): 61mm
(5) Material of shaft (sound shaft): (higher grade) 45# Metal, quenching and tempering treatment method
(six) Remedy of rollers: Challenging chromize coated
(seven) Generate type of roll forming device: Push by chain
(eight) Chain: 19.05 mm (high grade)
(nine) CZPT: 6210 (substantial quality)
(10) Reducer: five# (substantial quality)
(11) Electrical power of primary motor: two.2KW
(twelve) Voltage: 380V/50Hz/3phase
(13) Line speed: About ten-twelve m/min
(fourteen) Feeding width: 1000-1200mm
(fifteen) Appropriate coil thickness: Recognized thickness for metal coil is .35mm-.50mm.
(16) Cutter: 3sets
(17) Visual appeal dimension of main forming machine: 1.5m (length)*1.0m (width) *1.2m (top)
(18) Fat of primary forming device: About .9T
(19) CZPTal areas: DELIXI or CHINT
 

Model  FM-840/900
Machine dimensions (mm) 6500*1300*1500
Weight  3600kg
Frame structure  300H metal
Plate thickness 16mm
Roll forming line quantity Upper: 9 rows, beneath: eleven rows
Shaft material  45#metal, Quenching treatment
Forming axial measurement Diameter 72(reliable)
Molding push roll material forty five#steel, Tough chromium plating method
Transmission way Sprocket chain transmission
Sprocket chain specification .6 inches
Overall electrical power six KW
Forming the host energy three KW
Products molding pace eight-10m/min/hydraulic push fifteen meters for each minute
Rolling content thickness .3-.8mm
Plate width 1000mm/1000mm
Personal computer handle program PLC
CZPT shear system CZPT shear power is 3KW, shearing mould employed Cr12 high temperature quenching procedure.
Ideal material  Color metal sheet, galvanize metal sheet

Company Introduce:
Our organization, HangCZPT CZPT Roll Forming Equipment Co., Ltd, as the expert and foremost manufacturer, can manufacture, design and style, set up and debug a variety of roll forming devices and metal processing sheet equipments, which make metallic roof wall panel, glazed roof tile, CZ steel purlin, floor decking, roof ridge cap, sandwich panel, roof truss, shutter panel, shutter slat, doorway body, guardrail, and steel sheet uncoiler, bending, slitting, chopping, flattening, punching, crimping.
Backed by reasonable design and style, precision machining and selected materials, the two our standard and CZPT equipment are characterised by prolonged lifestyle span, precise forming and easy procedure. With our customers’ believe in, our equipment have been despatched to The united states, Australia, Russia, India, Sri Lanka, Nigeria, Pakistan, Uzbekistan, Mozambique, Angola, Turkey, Brazil, and many others.
Warmly welcome to China to pay a visit to our factory and choose the machines you want. Our tackle, Fuzhuang CZPT CZPT Zone, HangCZPT CZPT, ZheJiang Province, China

After-income provider motivation
one, ensures for bought products, in the 3 packets of time period, such as the issues triggered by production high quality goods manufacturing facility fix, substitute or return Owing to other causes of problems, the manufacturing unit aid user resolve the dilemma actively, to guarantee that the solution put into operation in time, lessen the incident decline to the cheapest degree.

two, main tools installation, commissioning, on-internet site complex providers, headed by deputy chief engineer of complex authorities from charge doorway to door provider, in purchase to remedy person issues. Key assignments in construction internet site.

three, following your company’s merchandise get there, experts will assist the set up instruction, commissioning, and many others.

four, actively cooperate with the consumer website operation and servicing management perform to boost the quality of items, can provide our goods to the consumer at any time to the expense price of spare parts and add-ons.

five, insist on quality very first, user supreme theory, obey the contact of the consumer at any time, when want to on-internet site service, I plant to ensure consumers discover reply inside of 24 several hours, 72 several hours to attain the scene, emergency instances to get the fastest implies of journey in 32 hrs.

6, in the scope of upkeep of gear such as prevalence high quality problem, the company responsible for cost-free maintenance, and get there inside two-five several hours to the user’s cellphone or reply.

if u have any fascination,you should speak to me any time

 

 

Steel Coil Aluzinc Galvanized Automatic Slitting Building Construction Making Machine